Meridia News|Truly global news from every meridian
Egypt·Zawia3·Arabic
·economics

Government Gives Owners of Code-Based Meters a Six-Month Window to Regularize Status, with 30% Discount for Applicants

Prime Minister Madbouly announced a six-month deadline for users of code-based meters installed before 2024 to regularize their status, along with a 30% reduction for those who apply within this period.

Read original at Zawia3 →
الحكومة تمنح أصحاب العدادات الكودية مهلة 6 أشهر للتصالح وخفضًا 30% للمتقدمين

Prime Minister Mostafa Madbouly announced on Saturday, 24 October 2026, that users of coded electricity meters installed before 2024 who have not applied for reconciliation of building violations will have a six-month window to regularise their status. Those who apply within this period will receive a 30% discount, in accordance with the prescribed regulations. The announcement was part of the recommendations of "Egypt Forum 2026," which Madbouly presented at the forum's closing session in the presence of President Abdel Fattah el-Sisi.

Coded meters have been billed at a uniform rate since April 2026 of EGP 2.74 (5.7 US cents) per kilowatt-hour, outside the tiered system applied to residential meters. If the discount is applied to this rate, it would fall to about EGP 1.92 (4 US cents). The government has not yet announced when the window will begin, and electricity distribution companies are awaiting completion of the executive procedures and mechanisms for applying the reduction.

Among the same recommendations, the government announced that reconciliation procedures for building violations will not exceed 12 months from the approval of the amended law. These procedures will take into account price differences between areas, separate housing for low-income groups from commercial and investment uses, expand instalment payment options, offer incentives for early payment, and simplify the required documentation.

Coded meters carry a code number that identifies the residential unit. They are installed in units within buildings that are in violation or unlicensed in order to bill them for actual consumption. Installing such a meter does not constitute legalisation of the building or proof of ownership of the unit.

Photo: Mujaddara, via Wikimedia Commons (CC BY-SA 3.0)

Source: zawia3.com

About this translation

This article was translated from Arabic into English by Meridia News using AI, and may contain errors. How Meridia translates

Original headline
الحكومة تمنح أصحاب العدادات الكودية مهلة 6 أشهر للتصالح وخفضًا 30% للمتقدمين
Published by
Zawia3,
Original article
Read at Zawia3 ↗