President Luiz Inácio Lula da Silva participated on Wednesday (1st) in Vera Cruz, Bahia, in the ceremony marking the official start of works on the Salvador-Itaparica bridge.
Linked to the New PAC, the project is estimated at R$ 11.6 billion, divided among the federal government, state government, and a business consortium. The forecast is that the work will be completed in 2031.
The bridge will connect Bahia's capital to the island of Itaparica, crossing the Bay of All Saints.
It will span 12.4 kilometers over the sea, making it the largest bridge in Latin America by the criterion of length above water level, surpassing, for example, the Rio-Niterói Bridge, which has approximately 13.2 km total length, with 8.3 km over sea.
During the public event, Lula and Bahia's governor, Jerônimo Rodrigues, highlighted the strategic importance of the project, which will create a new road logistics corridor for the western part of the state, reducing the distance by more than 200 km for cargo transport between the capital and the interior and benefiting approximately 245 municipalities.
"Undeniably, Bahia needed another outlet for the wealth produced by Bahia, and the choice was made to build this bridge and build a highway," said Lula.
However, both the president and the governor warned of the need to ensure that the new reality of the region does not attract real estate speculation that affects the quality of life of island residents.
The president highlighted the calm and bucolic pace of the island, which concentrates different municipalities with strong beach culture and linked to the formation of Bahian culture. "We must not allow real estate speculation to take over this island."
Governor Jerônimo Rodrigues highlighted that the bridge is long-awaited and that care must be taken of the island. "From today on, we give visibility to the project. [But] we must be careful with the island's population, we must not allow uncontrolled occupation, sometimes in an aggressive way, by the real estate sector."
Partnership with China
As the fruit of a public-private partnership (PPP), the work is the responsibility of the Salvador-Itaparica Bridge Consortium, formed by Chinese state-owned companies, including the China Communications Construction Company (CCCC), the China Civil Engineering Construction Corporation (CCECC), and the China Railway 20th Bureau Group (CRCC).
The bridge will have a central span of approximately 400 meters wide for navigation and approximately 85 meters of clearance height, allowing large vessels to pass through the Bay of All Saints.
The project also includes a road system with access points in Salvador and Vera Cruz, plus a new express highway that will bypass the urban area of the island, and the duplication of road sections in the region, connecting it to the other side of the continent. More than seven thousand jobs are expected to be generated during the construction.
According to the consortium responsible for the work, the expectation is to reach a flow of 28,000 vehicles per day already at the start of operations. In Salvador, the bridge will be accessed in the Água de Meninos region. On Itaparica Island, the bridge's entrance will be in the Gameleira region.
